| Site Name | Nearest Town | Property Size | Price | Buildings | Zoning | Details | Photos | Location Map | Site Map |
|---|---|---|---|---|---|---|---|---|---|
| Chiloquin Airport | Chiloquin | 80 Acres | None | Heavy Industrial General Commercial |
HERE | YES | YES |
| Tax ID | R-3407-034CB-00200/300/400/500/600/700/900-000 R-3407-034CC-00100/200-000 |
Location | Structure Ceiling | ||
| County | Klamath | Can subdivide? | Yes | Dock and Grade Doors | |
| Industrial Park? | No, proposed | Minimum Acres for Sale | Unknown | Other Features | |
| Foreign Trade Zone? | No | Site Dimensions | irregular | Building Terms | |
| Enterprise Zone? | No | Structure Type Size | Last known owner contact | June 11, 1999 |
| Owner | Property Representative | City of Chiloquin Teresa Foreman |
|
| Address | Address | P.O. Box 196 Chiloquin, OR 97624 |
|
| Phone | Phone | 541-783-2717 | |
| Fax | Fax | 541-783-2035 | |
| WWW | WWW |
| Economic Development Agency | Klamath Co. Econ. Dev. Assn. Trey Senn |
Local City Planner | Chiloquin Planning Commission |
| Address | 706 Main Street, 3rd Floor P.O. Box 1777 Klamath Falls, OR 97601 |
Address | P.O. Box 196 Chiloquin, OR 97624 |
| Phone | 541-882-9600 | Phone | 541-783-2717 |
| Fax | 541-882-7648 | Fax | 541-783-2035 |
| kceda@fireserve.net | |||
| WWW | www.kceda.com | WWW |
| Nearest Interstate | I-5 | Nearest Highway | US-97 | Nearest Airport | Klamath Falls International |
| Miles to Interstate | 180 | Miles to Highway | 0.25 | Miles to Airport | 32 |
| Time to Interstate | 300-330 minutes | Time to Highway | 2 minutes | Time to Airport | 45 minutes |
| Nearest Container Facility (with loading/unloading) | Portland | Nearest Port (with bulk loading/unloading) | Portland | Nearest Railroad | Southern Pacific |
| Miles to Container Facility | 251 | Miles to Port | 251 | Rail Spur on Site? | No |
| Time to Container Facility | 300-360 minutes | Time to Port | 300-360 minutes | Spur Extension Possible? | No |
| Cost to extend spur to site? |
| Access road meet industrial street standards? | Not yet constructed |
| If not, who is responsible for road? | |
| Number of lanes |
| Codes, covenants or restrictions? | Yes | Existing easements or encumbrances? | None | Zoning | Heavy Industrial and General Commercial |
| City Zoning Description | IH & CG | Maximum Height Limitation | 35 feet | Maximum Coverage Ratio (facilities to site) | 100% except setbacks |
| Maximum Front Setback | 20 feet | Present/Historical Use | Vacant | Current/Future use of adjacent land | Airport, residential, City Park |
| Maximum Rear Setback | 5 feet | Adjacent Zoning and Plan Designation | N/A | Within City Limits? | Yes |
| Maximum Side Setback | 5 feet | If not in City, city's priority for infrastructure inmprovements? | Grants for improvements pending | In Urban Growth Boundary? | Yes |
| Site Photo Available? | yes | Plat Map Available? | yes | Local Map with Access Roads? | yes |
| Soil Type | Volcanic/pumice | Soil Classification | III or Higher | Slope | 1-3% |
| Topography and Vegetation | Slightly rolling above grade, trees and grass | Wetlands determination completed? | no | Wetlands deliniation completed? | No |
| Size of Wetlands | none | State or CEO wetland permit issued? | No | Date DSL fill permit issued | |
| Date 404 certification permit issued | Level I or II environmental assessment done? | No | Brownfield (real or perceived)? | No | |
| If brownfield, has site been cleaned? | DEQ certificate of clean up complted? | Date DEQ Certificate Issued | |||
| DEQ Project Manager | Near a 303(d) "Water Quality Limited Stream?" | No | In a listed riparian corridor? | No | |
| Wildlife habitat issues? | No | Air Quality Non-Attainment Area? | No | Air Quality Maintenance Area? | No |
| In 100-year flood plain? | No | Physical constraints? | Culturally Sensitive |
| Water Provider | City of Chiloquin | Sewer Provider | City of Chiloquin | Gas Provider | None |
| Total Water Capacity | 700 Gallons per day | Total Sewer Capacity | 200,000 gallons per day | Gas available? | No |
| Excess Water Capacity | unknown | Excess Sewer Capacity | 80,000 gal/day | Cost to Extend Gas | |
| Water at site? | No, 300 feet NW | Sewer at Site? | No | ||
| Water Line Size | 2 inches | Sewer Line Size | Gas Line Size | ||
| Cost to extend water to site | $330,000+ | Cost to extend sewer to site | $159,750+ |